Preparing for remodeling the bathroom.

Tile is made only after the installation of pipes, installation of bath and the front door. If the bath panel is finished in stone, this panel bath is sometimes a door is mounted to the fact that access to the bathroom drains. But it is preferable to a removable hatch, using as NABS magnetic fasteners (very strong, and no fewer than four pieces of them).

If there is a bathroom furniture in the room already, should be covered withcovers, cardboard, etc. bathroom is usually covered with plywood (10-15 mm) or a board of wood chips, to prevent it from accidentally falling litter and the fact that support for the solution of a bucket of glue, tools or stone. If the floor is tiled, you need to cover it. It is preferable to a wet cloth with you to clean the tiles or dirty hands.

Philo size (between the tiles), depends on the quality of tiles (edge roughness) and the aesthetic requirements. Nate is usually1.5-3 mm wide, ceramic tiles too big – 5 mm. Using the stone leg is to help maintain even spacing between the stones. Not all the wall tiles in a day because they have no time to hold firmly to the wall.

If you plan to use several other decorative details, such as limits for the insertion of tiles with patterns, it is important to define its place on the wall. The coating of the interior angles and exterior special plastic corner bar can be used.They make the corners look more attractive. Flexible arm ensures perfect agreement with the wall or the floor. When purchasing plastic corner bar, choose so that the thickness of stone groove dimensions may not exceed.

Establishing new walls: brick, moisture-resistant gypsum, concrete or foam. Placement of ventilation. Wire bonding, water and sewers, layout, replacing the towels (I recommend creating a parallel path through the door to the possibility of improvementEmergency stopping by the hot water main and put a ball-lock valve in the distribution). September valves for hot water pipes, go to the coil tank and a washing machine. Compiling the ceiling with integrated lighting assembly. Impermeable layer. Plastering. Coatings. The installation of the bathtub. Installation of equipment for the bathroom. Floors. That is all. At this point, complete the renovation of the bathroom.

For a small bathroom, you can choose a specialtyprograms developed, mini-bathroom accessories, occupy less space. There is a special effect doll when everything seems bigger than the shorter barrels.

Quality work.

Tiles should be strictly vertical cement, tiles of all the blocks on the same level does not lie. Imminent or down to an advantage over another block is unacceptable. There should not be placed in blocks of stone. The space between the tiles should be equaleverywhere. Seams tile must fit together to form a straight line (strictness). Patterns of tiles to be searched. The space between the tiles should be properly grouted.